Introduction
As part of the 4 yearly review, the Electrical, Electronic and Communications Contracting Award 2010 (MA000025) was reviewed by a Full Bench of the Commission.
As part of the 4 yearly review, the Electrical, Electronic and Communications Contracting Award 2010 (MA000025) was reviewed by a Full Bench of the Commission.
Current copy of the Electrical, Electronic and Communications Contracting Award 2020
Organisation | Document title | Document date | Date uploaded |
---|---|---|---|
Fair Work Commission | Determination – Electrical, Electronic and Communications Contracting Award 2020 – correction | 11 November 2020 | 11 November 2020 |
Fair Work Commission | Determination - Electrical, Electronic and Communications Contracting Award 2020 | 07 October 2020 | 07 October 2020 |
Fair Work Commission | Decision - [2020] FWFB 5307 | 06 October 2020 | 06 October 2020 |
CEPU | AM2019/17 - submission | 27 July 2020 | 27 July 2020 |
Fair Work Commission | Statement - [2020] FWCFB 3728 | 16 July 2020 | 16 July 2020 |
National Electrical and Communications Association | Submission - Tranche 3 - report | 18 June 2020 | 18 June 2020 |
Fair Work Commission | Determination | 12 June 2020 | 12 June 2020 |
Fair Work Commission | Decision - [2020] FWCFB 3074 | 12 June 2020 | 12 June 2020 |
National Electrical and Communications Association | Correspondence and reply from FWC | 09 June 2020 | 09 June 2020 |
Fair Work Commission | Statement - [2020] FWCFB 2908 | 04 June 2020 | 04 June 2020 |
Fair Work Commission | Report - Tranche 3 - Electrical, Electronic and Communications Contracting Award | 01 June 2020 | 02 June 2020 |
Fair Work Commission | Transcript - 25 May 2020 - Tranche 3 - Electrical, Electronic and Communications Contracting Award | 28 May 2020 | 28 May 2020 |
Communications Electrical Plumbing Union | Submission - Tranche 3 | 26 May 2020 | 26 May 2020 |
Fair Work Commission | Notice of listing - 25 May 2020 - Tranche 3 - Electrical, Electronic and Communications Contracting Award | 18 May 2020 | 18 May 2020 |
Fair Work Commission | Exposure draft – Electrical, Electronic and Communications Contracting Award – changes tracked – 14 May 2020 | 14 May 2020 | 14 May 2020 |
Fair Work Commission | Draft award variation determination – Electrical, Electronic and Communications Contracting Award – 14 May 2020 | 14 May 2020 | 14 May 2020 |
Fair Work Commission | Decision - [2020] FWCFB 2124 | 27 April 2020 | 27 April 2020 |
Australian Manufacturing Workers’ Union | Submission in reply - Tranche 3 - multiple modern awards | 07 April 2020 | 08 April 2020 |
Australian Industry Group | Submission in reply - Tranche 3 - multiple modern awards | 07 April 2020 | 08 April 2020 |
Australian Business Industrial and NSW Business Chamber | Submission in reply - Tranche 3 - exposure drafts - multiple modern awards | 07 April 2020 | 08 April 2020 |
Fair Work Commission | Statement - [2020] FWCFB 1827 | 07 April 2020 | 07 April 2020 |
CEPU | Submission in reply | 07 April 2020 | 07 April 2020 |
Fair Work Commission | Background paper - Tranche 3 | 23 March 2020 | 23 March 2020 |
Fair Work Commission | Statement - [2020] FWCFB 1539 | 23 March 2020 | 23 March 2020 |
Fair Work Commission | Statement - [2020] FWC 1256 | 10 March 2020 | 10 March 2020 |
Australian Business Industrial and NSW Business Chamber | Submission - Tranche 3 - exposure drafts - multiple modern awards | 06 March 2020 | 06 March 2020 |
Australian Industry Group | Submissions - Tranche 3 - exposure drafts - multiple modern awards | 06 March 2020 | 06 March 2020 |
Fair Work Commission | Exposure draft – Electrical, Electronic and Communications Contracting Award – changes tracked | 29 January 2020 | 29 January 2020 |
Fair Work Commission | Draft award variation determination – Electrical, Electronic and Communications Contracting Award | 29 January 2020 | 29 January 2020 |
Fair Work Commission | Decision - [2020] FWCFB 421 | 29 January 2020 | 29 January 2020 |
Fair Work Commission | Decision - [2019] FWCFB 6935 | 14 October 2019 | 14 October 2019 |
Fair Work Commission | Transcript - 9 October 2019 | 10 October 2019 | 11 October 2019 |
Fair Work Commission | Statement - [2019] FWCFB 6899 | 08 October 2019 | 08 October 2019 |
Fair Work Commission | AM2019/17 - notice of listing - 9 October 2019 - amended | 08 October 2019 | 08 October 2019 |
Australian Industry Group | Submission in reply - multiple awards - exposure drafts | 23 September 2019 | 23 September 2019 |
CEPU - Electrical Division | Submission in reply - exposure draft | 20 September 2019 | 20 September 2019 |
Fair Work Commission | Decision - [2019] FWCFB 6077 | 02 September 2019 | 02 September 2019 |
CEPU - Electrical Division | AM2018/21 - correspondence and correspondence in reply in FWC - cancellation of hearing | 22 May 2019 | 24 May 2019 |
Fair Work Commission | AM2018/21 - notice of listing - 27, 28, 29 and 30 May 2019 - cancelled | 19 March 2019 | 20 May 2019 |
Fair Work Commission | AM2014/1 and AM2016/15 - notice of listing - 29 April 2019 - further amended | 18 April 2019 | 23 April 2019 |
Australian Business Industrial and NSW Business Chamber | Submission - exposure drafts | 12 April 2019 | 12 April 2019 |
Master Electricians Australia | Submission - exposure draft | 11 April 2019 | 11 April 2019 |
Fair Work Commission | AM2018/21 - directions amended | 05 April 2019 | 05 April 2019 |
Fair Work Commission | AM2018/21 - notice of listing - 4 April 2019 - amended | 29 March 2019 | 01 April 2019 |
Australian Industry Group | AM2018/21 - correspondence - directions | 29 March 2019 | 29 March 2019 |
Fair Work Commission | Exposure draft - Electrical, Electronic and Communications Contracting Award - revised | 22 March 2019 | 22 March 2019 |
Fair Work Commission | AM2018/21 - directions | 19 March 2019 | 19 March 2019 |
Fair Work Commission | AM2014/1 - notice of listing - 3 April 2019 - amended | 28 February 2019 | 01 March 2019 |
Fair Work Commission | Statement - [2019] FWC 1262 | 28 February 2019 | 28 February 2019 |
Fair Work Commission | Statement - [2019] FWC 932 | 13 February 2019 | 13 February 2019 |
Fair Work Commission | Statement - [2019] FWC 717 | 06 February 2019 | 07 February 2019 |
Fair Work Commission | Statement - [2018] FWC 7869 | 24 December 2018 | 24 December 2018 |
Fair Work Commission | Decision - [2018] FWCFB 6852 | 13 November 2018 | 14 November 2018 |
Fair Work Commission | Statement - [2018] FWC 6107 | 01 October 2018 | 02 October 2018 |
Fire Protection Association Australia | Correspondence - claim withdrawn | 24 August 2018 | 24 August 2018 |
Fair Work Commission | Transcript - 17 August 2018 | 17 August 2018 | 23 August 2018 |
Master Electricians Australia | Submission | 22 August 2018 | 23 August 2018 |
Fire Protection Association Australia | Submission - multiple awards | 21 August 2018 | 22 August 2018 |
Australian Business Industrial and the NSW Business Chamber | Correspondence and reply from FWC - extension of time | 22 August 2018 | 22 August 2018 |
Fire Protection Association Australia | Submission - exposure draft | 15 August 2018 | 15 August 2018 |
Fair Work Commission | Notice of listing - 17 August 2018 | 10 August 2018 | 10 August 2018 |
Fair Work Commission | Decision - [2018] FWCFB 4175 | 07 August 2018 | 07 August 2018 |
Australian Business Industrial and NSW Business Chamber | Submission - exposure drafts - multiple awards | 20 April 2018 | 20 April 2018 |
CEPU - Electrical Division | Submission - exposure drafts | 19 April 2018 | 20 April 2018 |
Australian Manufacturing Workers' Union | Correspondence and correspondence in reply from FWC - exposure drafts - extension request | 19 April 2018 | 19 April 2018 |
Master Electricians Australia | Submission - exposure draft | 19 April 2018 | 19 April 2018 |
Fair Work Commission | Exposure draft - Electrical, Electronic and Communications Contracting Award 2016 - further revised | 26 March 2018 | 26 March 2018 |
Fair Work Commission | Decision - [2018] FWCFB 1548 | 21 March 2018 | 21 March 2018 |
Fair Work Commission | Summary of submissions - technical and drafting | 23 November 2017 | 23 November 2017 |
Fair Work Commission | Summary of submissions - substantive issues - further revised | 08 August 2017 | 08 August 2017 |
Business SA | Submission - group 3 decision - all purpose allowances - occupational health and safety - Pastoral Award | 04 August 2017 | 07 August 2017 |
National Electrical and Communcations Association | Submission - claims withdrawn | 24 July 2017 | 24 July 2017 |
Fire Protection Association Australia | Correspondence - FWC documents | 01 May 2017 | 04 May 2017 |
Fair Work Commission | Correspondence - directions | 24 April 2017 | 24 April 2017 |
Fair Work Commission | Report | 24 April 2017 | 24 April 2017 |
Fair Work Commission | Summary of submissions - technical and drafting - further revised | 24 April 2017 | 24 April 2017 |
Fair Work Commission | Transcript - 28 February 2017 | 28 February 2017 | 28 March 2017 |
Fair Work Commission | Summary of submissions - technical and drafting - further revised | 27 March 2017 | 27 March 2017 |
Fair Work Commission | Summary of submissions - substantive issues - revised | 27 March 2017 | 27 March 2017 |
Fair Work Commission | Transcript - 27 March 2017 | 27 March 2017 | 27 March 2017 |
Fair Work Commission | Notice of listing - 27 March 2017 - amended | 27 March 2017 | 27 March 2017 |
Fire Protection Association Australia | Submission in reply - Schedule B | 10 March 2017 | 10 March 2017 |
CEPU - Electrical Division | Submission in reply - clause 13 and schedule B | 08 March 2017 | 08 March 2017 |
Australian Industry Group | Submission in reply - Schedule B | 07 March 2017 | 07 March 2017 |
Fire Protection Association Australia | Submission - parties draft determination - shift work | 03 March 2017 | 03 March 2017 |
National Electrical Contractors Association | Submission in reply - Schedule B | 03 March 2017 | 03 March 2017 |
Fair Work Commission | Notice of listing - 27 March 2017 | 01 March 2017 | 01 March 2017 |
Fair Work Commission | Summary of submissions - technical and drafting - further revised | 28 February 2017 | 28 February 2017 |
Master Electricians Australia | Submission - Schedule B | 27 February 2017 | 28 February 2017 |
National Electrical and Communications Association | Correspondence in reply - report back - Schedule B | 15 February 2017 | 16 February 2017 |
Fire Protection Association Australia | Correspondence in reply - report back - Schedule B | 15 February 2017 | 15 February 2017 |
Australian Industry Group | Correspondence - report back - parties draft determination - Schedule B | 14 February 2017 | 15 February 2017 |
Australian Business Industrial and the NSW Business Chamber | Correspondence in reply - report back - parties draft clause 13 | 10 February 2017 | 10 February 2017 |
Australian Industry Group | Correspondence in reply - report back - parties draft clause 13 | 09 February 2017 | 10 February 2017 |
Fire Protection Association Australia | Correspondence - report back - parties draft clause 13 | 03 February 2017 | 06 February 2017 |
Fair Work Commission | Summary of submissions - technical and drafting - further revised | 01 February 2017 | 01 February 2017 |
Fair Work Commission | Transcript - 23 January 2017 | 23 January 2017 | 25 January 2017 |
Fair Work Commission | Notice of listing - 28 February 2017 | 23 January 2017 | 23 January 2017 |
Australian Industry Group | Submission - exposure draft and summary of submissions | 16 January 2017 | 16 January 2017 |
Fair Work Commission | Summary of submissions - substantive issues | 06 January 2017 | 06 January 2017 |
Fair Work Commission | Exposure draft - Electrical, Electronic and Communications Contracting Award 2016 - revised | 03 January 2017 | 03 January 2017 |
Fair Work Commission | Summary of submissions - technical and drafting - revised | 03 January 2017 | 03 January 2017 |
Fair Work Commission | Notice of listing - 23 January 2016 - amended | 30 December 2016 | 30 December 2016 |
Master Electricians Australia | Correspondence - video link request | 20 December 2016 | 20 December 2016 |
Business SA | Correspondence - video link request | 15 December 2016 | 16 December 2016 |
Fair Work Commission | Notice of listing - 23 January 2017 | 14 December 2016 | 14 December 2016 |
Fair Work Commission | Transcript - 6 December 2016 | 07 December 2016 | 07 December 2016 |
Association of Consulting Architects Australia | Correspondence | 05 December 2016 | 05 December 2016 |
Fair Work Commission | Notice of listing - further amended - 6 December 2016 | 01 December 2016 | 01 December 2016 |
Fair Work Commission | Report to the Full Bench | 30 November 2016 | 30 November 2016 |
Fair Work Commission | Summary of submissions - technical and drafting | 30 November 2016 | 30 November 2016 |
Fair Work Commission | Notice of listing - amended - 6 December 2016 | 21 November 2016 | 21 November 2016 |
Master Electricians Australia | Submission - substantive claims | 07 November 2016 | 07 November 2016 |
Fair Work Commission | Notice of listing - 7 November 2016 - amended | 17 October 2016 | 17 October 2016 |
Australian Business Industrial and others | Correspondence - video link reqests | 14 October 2016 | 17 October 2016 |
Fair Work Commission | Notice of listing - 7 November 2016 | 07 October 2016 | 07 October 2016 |
Fair Work Commission | Notice of listing - 6 December 2016 | 06 October 2016 | 06 October 2016 |
United Voice | Correspondence and correspondence in reply from FWC - extension of time | 30 September 2016 | 05 October 2016 |
CEPU - Electrical Division | Submission - substantive claims and conference | 30 September 2016 | 03 October 2016 |
National Electrical and Communications Association | Submission - substantive claims | 30 September 2016 | 03 October 2016 |
Master Electricians Australia | Submission - substantive claims | 30 September 2016 | 03 October 2016 |
Australian Industry Group | Submission - all awards - general issues in exposure drafts | 31 August 2016 | 02 September 2016 |
Fair Work Commission | Statement and directions - [2016] FWC 6062 | 26 August 2016 | 26 August 2016 |
Fair Work Commission | Transcript - 24 August 2016 | 24 August 2016 | 25 August 2016 |
Fair Work Commission | Notice of listing - 24 August 2016 - further amended - video link | 22 August 2016 | 22 August 2016 |
Fair Work Commission | Notice of listing - 24 August 2016 - further amended | 18 August 2016 | 19 August 2016 |
Fair Work Commission | Notice of listing - 24 August 2016 - amended | 16 August 2016 | 17 August 2016 |
Fair Work Commission | Notice of Listing - 24 August 2016 | 16 August 2016 | 16 August 2016 |
Fair Work Commission | Statement and directions - [2016] FWC 5694 | 15 August 2016 | 16 August 2016 |
Australian Industry Group | Submission in reply - exposure drafts | 22 July 2016 | 25 July 2016 |
Master Electricians Australia | Submission in reply - exposure draft | 22 July 2016 | 25 July 2016 |
Australian Business Industrial and the NSW Business Chamber | Submission in reply - exposure drafts | 22 July 2016 | 22 July 2016 |
National Electrical and Communications Association | Submission in reply - exposure draft | 21 July 2016 | 22 July 2016 |
National Electrical and Communications Association - SA | Submission in reply - exposure draft | 21 July 2016 | 22 July 2016 |
Business SA | Submission in reply - exposure drafts | 21 July 2016 | 22 July 2016 |
United Voice | Correspondence | 21 July 2016 | 21 July 2016 |
Fair Work Commission | Statement - [2016] FWC 4781 | 15 July 2016 | 15 July 2016 |
Australian Industry Group | Submission - exposure drafts | 08 July 2016 | 11 July 2016 |
Australian Industry Group | Correspondence - extension of time | 01 July 2016 | 01 July 2016 |
Business SA | Submission - exposure drafts | 30 June 2016 | 01 July 2016 |
Master Electricians Australia | Submission - exposure draft | 30 June 2016 | 01 July 2016 |
National Electrical and Communications Association - SA | Submission - exposure draft | 30 June 2016 | 01 July 2016 |
Fire Protection Association Australia | Submission - exposure draft | 30 June 2016 | 30 June 2016 |
National Electrical and Communications Association | Submission - exposure draft | 30 June 2016 | 30 June 2016 |
CEPU - Electrical, Energy and Services Division | Submission - exposure draft | 23 June 2016 | 24 June 2016 |
Fair Work Commission | Comparison of exposure draft to modern award | 23 May 2016 | 23 May 2016 |
Fair Work Commission | Exposure draft - Electrical, Electronic and Communications Contracting Award 2016 | 23 May 2016 | 23 May 2016 |
Fair Work Commission | Statement and amended directions - [2016] FWC 2924 | 10 May 2016 | 10 May 2016 |
Fair Work Commission | Summary of proposed variations - group 4 | 24 March 2016 | 24 March 2016 |
Fair Work Commission | Statement - [2016] FWC 1838 | 23 March 2016 | 23 March 2016 |
Fair Work Commission | Statement - [2016] FWC 1191- correction | 01 March 2016 | 02 March 2016 |
Fair Work Commission | Revised summary of proposed variations - group 3 and 4 awards | 24 February 2016 | 24 February 2016 |
Fair Work Commission | Statement - [2016] FWC 1191 | 24 February 2016 | 24 February 2016 |
Fair Work Commission | Transcript - 14 December 2015 | 15 December 2015 | 15 December 2015 |
Fair Work Commission | Summary of proposed variations - substantive claims - groups 3 and 4 | 11 December 2015 | 11 December 2015 |
Fair Work Commission | Notice of listing - 14 December 2015 - further amended | 10 December 2015 | 10 December 2015 |
Fair Work Commission | Proposed schedule - mention - 14 December 2015 - group 3 and 4 awards | 10 December 2015 | 10 December 2015 |
Fair Work Commission | Notice of listing - amended - 14 December 2015 | 03 December 2015 | 03 December 2015 |
Fair Work Commission | Notice of listing - 14 December 2015 | 26 November 2015 | 26 November 2015 |
Australian Industry Group | Submission - substantive claims | 12 November 2015 | 12 November 2015 |
National Electrical and Communications Association | Submissions - substantive claims | 12 November 2015 | 12 November 2015 |
Fair Work Commission | Directions | 02 November 2015 | 02 November 2015 |
Association of Australian Medical Research Institutes | Correspondence - draft directions | 29 October 2015 | 29 October 2015 |
Australian Services Union | Correspondence - draft directions | 29 October 2015 | 29 October 2015 |
Fair Work Commission | Statement - [2015] FWC 7253 | 21 October 2015 | 22 October 2015 |
Fair Work Commission | Decision - [2015] FWCFB 6656 | 30 September 2015 | 30 September 2015 |
Fair Work Commission | Full Bench decision - [2015] FWCFB 4658 - ordinary hourly rate of pay | 13 July 2015 | 14 July 2015 |
Fair Work Commission | Notice of listing - 31 March 2015 - cancelled | 25 March 2015 | 25 March 2015 |
Fair Work Commission | Statement | 24 March 2015 | 24 March 2015 |
Fair Work Commission | Notice of listing - 31 March 2015 | 19 March 2015 | 19 March 2015 |
Australian Federation of Employers and Industries | Submission | 05 March 2015 | 06 March 2015 |
Business SA | Submission | 02 March 2015 | 02 March 2015 |
National Electrical and Communications Association | Submission | 02 March 2015 | 02 March 2015 |
CEPU - Electrical, Energy and Services Division | Submission | 02 March 2015 | 02 March 2015 |
Australian Industry Group | Submission | 02 March 2015 | 02 March 2015 |
Master Electricians Australia | Submission | 02 March 2015 | 02 March 2015 |
Fair Work Commission | Notice of listing - 31 March 2015 | 25 February 2015 | 25 February 2015 |
Fair Work Commission | Notice of listing - 11 February 2015 - Cancelled | 23 January 2015 | 23 January 2015 |
Fair Work Commission | Statement Award stage Group 3 and 4 awards Revised schedule | 23 January 2015 | 23 January 2015 |
Fair Work Commission | Notice of listing - 11 February 2015 | 11 January 2015 | 13 January 2015 |
Fair Work Commission | Full Bench decision Award stage exposure drafts Group 1A and 1B General drafting alleged inconsistencies with NES | 23 December 2014 | 02 January 2015 |
Fair Work Commission | Statement - [2014] FWC 8985 | 11 December 2014 | 11 December 2014 |
Fair Work Commission | Statement [2014] FWC 8575 | 28 November 2014 | 28 November 2014 |
Fair Work Commission | Transcript - 18 November 2014 | 18 November 2014 | 20 November 2014 |
Fair Work Commission | Notice of listing - 18 November 2014 | 31 October 2014 | 31 October 2014 |